University of Birmingham

CASE STUDY University of Birmingham After conducting a feasibility study, the University of Birmingham was faced with the realisation that their existing library building, dating back to the 1950’s, could not be refurbished to the standards the university sets itself to offer their students and researchers state-of-the-art learning facilities. University of Birmingham  what products were […]

Teesside University

CASE STUDY Teesside University OE has been working with Teesside University to bring mobile device charging solutions to their refurbished lecture theatre at the heart of their campus. It was important to the university that these charging solutions were conveniently located throughout the theatre, but without taking up too much of the writing surface of […]

Imperial College London

CASE STUDY Imperial College London OE has been part of a significant renovation of two lecture theatres within Imperial College London’s Physics and Engineering departments. Both theatres were outdated and required a complete overhaul to meet the modern requirements of the College, which called for the use of new digital technologies to provide more creative, […]

PwC Manchester

CASE STUDY PwC Manchester November 2017 marked the start of a new era for PwC in the North West and the Manchester office as 920 staff said farewell to Barbirolli Square, the home of PwC Manchester for the last 20 years, and relocated to the new iconic No1 Spinningfields – the final commercial property to […]

Hong Kong Airport

airport charging units, seating, seats with charger, powered seats, airport charging,

CASE STUDY Hong Kong Airport Already established in Asia with a regional office in Singapore, Zoeftig have cemented their position in the far east market with the completion of Hong Kong International Airport’s new HK$10 billion Midfield Concourse. 6000 of their inFINITE seats and 1000 power positions have been fitted, with in-seat power as a key driver behind the design and […]

Lucknam Park

on surface custom designed power unit with logo

CASE STUDY Lucknam Park Lucknam Park Hotel & Spa offers “heritage and luxury combine[d] to create a quintessential home away from home”. Dating from the 1720’s, this luxury hotel and spa sits on the fringes of the Cotswolds in Wiltshire and attracts guests from across the globe. Lucknam Park what products were included? PLUTO On […]

London Stansted

CASE STUDY London Stansted Most people are anxious to fly. The couple of hours before your flight after check-in can be a particularly stressful and nerve-wracking time. Add to this the possibility of delays, and you’ll be hard-pressed to find a sense of calm or zen. London Stansted Airport terminal designers take this mind-set into […]

DLA Piper

CASE STUDY DLA Piper Global law firm DLA Piper recently consolidated their two London locations into one giant ‘hybrid open-plan’ working space covering 8-floors and 193,000 sf in the heart of the city. DLA Piper what products were included? PIXELTUF In desk power unit.  CLICK HERE for more information.  about this project We took a tour […]

DIrect Line Group

CASE STUDY Direct Line Group One of the UK’s leading insurers, Direct Line Group (DLG) makes up a family of well-known insurance companies including Direct Line, Churchill, Green Flag and more. A recent re-brand offered DLG the opportunity to refurbish their offices to re-align with the group’s ideals and provide a welcoming, productive environment that […]

Integral office

CASE STUDY Integral office Integral UK provides property maintenance to over 1,600 clients in 60,000 locations. To support that level of service, Integral required their own headquarters in Bristol to be a lean, agile working environment. Part of this scope required on-desk phone and laptop charging solutions at each of the 160 workstations as well […]