CASE STUDY

Hong Kong Airport

Already established in Asia with a regional office in Singapore, Zoeftig have cemented their position in the far east market with the completion of Hong Kong International Airport’s new HK$10 billion Midfield Concourse. 6000 of their inFINITE seats and 1000 power positions have been fitted, with in-seat power as a key driver behind the design and configuration of the seating solution.

hk-ph807z0zfnc94bkgcct793gz20sq3p60llnyj4oli0

Hong Kong Airport 

what products were included?

CUSTOM UNIT

OE worked to support Zoeftig to create two bespoke power units that fitted in line with Zoeftig’s requirements. Special individual USB charging modules were developed with each of the twin USB sockets capable of delivering 2.4 amps of power simultaneously. That’s double the power of traditional twin USB charging points, giving passenger’s devices a boost rather than just a ‘trickle charge’. Zoeftig had identified the need to have replaceable sockets so better still, the USB sockets were designed to be replaced without the need to change the USB module, reducing the cost of replacing damaged USB sockets, a feature that is unique to the Zoeftig custom designed power solutions. All modules were produced and colour matched to the new seats and feature Zoeftig’s full closed system cable management to ensure maximum passenger safety.